<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Projects Directory - GreenCollar</title>
	<atom:link href="https://greencollar.com.au/projects/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description>Better For The Planet, Better For Farmers</description>
	<lastBuildDate>Sun, 23 Mar 2025 11:29:08 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2022/05/04160619/GCFAV_.png</url>
	<title>Projects Directory - GreenCollar</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Darling River Conservation Initiative Site 8 HIR Project</title>
		<link>https://greencollar.com.au/projects/darling-river-conservation-initiative-site-8-hir-project/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Mon, 26 Feb 2024 23:47:50 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=10218</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/darling-river-conservation-initiative-site-8-hir-project/">Darling River Conservation Initiative Site 8 HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a164117c59d6"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row top-level  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located South West of Cobar in NSW in the Cobar Peneplain bioregion. The land consists of soft, sandy red soil, ranging from open shrublands interspersed by watercourses up to mulga ridge type country. The dominant species observed on the property from field surveys include Eremophila sturtii, Dodonaea lobulata, Callitris glaucophylla, Dodonaea viscosa and Acacia aneura.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands.  This is achieved by controlled grazing and feral animal management across the project area including fencing upgrades and water management. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (ERF132648) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c3) (the Determination) and generates Australian Carbon Credit Units (ACCUs).  This is the fifth version of the Human Induced Regeneration methodology.</p>
<p>The project has issued Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c3</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">20 May 2019</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">100 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">May 2009 – May 2019</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>&nbsp;</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 July 2014</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">FullCAM 2016</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audit undertaken by registered Greenhouse and Energy Auditors which have confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the periods audited. The most recent audit report was issued on the 7 August 2020.</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Darling River Conservation Initiative Site 8 Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Darling River Conservation Initiative Site 8 HIR Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 May 2020.</p>
<p>A summary of the stratification of the Darling River Conservation Initiative Site 8 HIR Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="49%"><strong>Project Area</strong></td>
<td width="49%">14,601 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref7"></a></td>
<td width="49%">37</td>
</tr>
<tr>
<td width="49%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="49%">5,342 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Total area excluded from CEA </strong></td>
<td width="49%">9,259 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="49%">6,180 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="49%">489 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="49%">2,591 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img fetchpriority="high" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154233/ERF132648_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154233/ERF132648_ProjectStrata.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154233/ERF132648_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154233/ERF132648_ProjectStrata-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154233/ERF132648_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154233/ERF132648_ProjectStrata-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154233/ERF132648_ProjectStrata-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154233/ERF132648_ProjectStrata-1320x1571.png 1320w" sizes="(min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas. This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to validate the stratification of the Darling River Conservation Initiative Site 8 project in accordance with the Determination and Guidelines, GreenCollar carried out extensive field surveys and data collection.  This included collection of data on existing vegetation species, stem density and vegetation height.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154239/617936_Everdale_GT_Waypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154239/617936_Everdale_GT_Waypoints.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154239/617936_Everdale_GT_Waypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154239/617936_Everdale_GT_Waypoints-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154239/617936_Everdale_GT_Waypoints-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154239/617936_Everdale_GT_Waypoints-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154239/617936_Everdale_GT_Waypoints-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154239/617936_Everdale_GT_Waypoints-1320x1571.png 1320w" sizes="(min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where ground truth surveys were conducted as part of the stratification process.</p>
<p>A <strong>Ground Truth</strong> <strong>Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a164117c8340" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="none"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154231/ERF132648_GT_Photo1-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154231/ERF132648_GT_Photo1-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154231/ERF132648_GT_Photo1-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154231/ERF132648_GT_Photo1-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154231/ERF132648_GT_Photo1.jpg 1080w" sizes="(max-width: 1024px) 100vw, 1024px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154232/ERF132648_GT_Photo2-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154232/ERF132648_GT_Photo2-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154232/ERF132648_GT_Photo2-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154232/ERF132648_GT_Photo2-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154232/ERF132648_GT_Photo2.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>The Guidelines also require a map accuracy assessment be completed before offset reporting.  This assessment must include the field sample plots, which can be used in conjunction with remote sensing samples.  The Clean Energy Regulator will accept mapping accuracies at or above 85 per cent for pre-existing forest and forest potential classification types.  The overall accuracy of the Darling River Conservation Initiative Site 8 classification was 86.29% which is greater than the 85% minimum requirement of The Guidelines.</p>
<p>After the completion of the map accuracy assessment, any additional exclusion areas were delineated prior to finalising the initial stratification. The extent of exclusion areas (totalling 9,259 ha), comprised of pre-existing forest cover (6,180 ha) and areas which classified as having no forest potential (489 ha). Through this process a final eligible CEA area of 5,342 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154236/ERF132648_SatImage.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154236/ERF132648_SatImage.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154236/ERF132648_SatImage-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154236/ERF132648_SatImage-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154236/ERF132648_SatImage-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154236/ERF132648_SatImage-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154236/ERF132648_SatImage-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154236/ERF132648_SatImage-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154235/ERF132648_CEA.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154235/ERF132648_CEA.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154235/ERF132648_CEA-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154235/ERF132648_CEA-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154235/ERF132648_CEA-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154235/ERF132648_CEA-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154235/ERF132648_CEA-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154235/ERF132648_CEA-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology requires using the Full Carbon Accounting Model (FullCAM) to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Darling River Conservation Initiative Site 8 HIR project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2080" width="4166" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve.png 4166w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve-300x150.png 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve-1024x511.png 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve-768x383.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve-1536x767.png 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve-2048x1023.png 2048w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve-1000x500.png 1000w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve-670x335.png 670w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_EVE_AbatementCurve-1320x659.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the land manager of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from land manager as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[6]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>A summary of regeneration checks required for the Darling River Conservation Initiative Site 8 HIR Project is set out below:</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[7]</a></sup></td>
<td width="359">20 May 2024</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[8]</a></sup></td>
<td width="359">20 May 2029</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[9]</a></sup></td>
<td width="359">01 July 2029</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Project Area Files</strong></h3>
<p>GIS shapefiles for the project can be downloaded <a href="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2024/02/04154230/ERF132648_ProjectStrata.zip">here</a>. These files detail the project stratification including the carbon estimation areas and exclusion areas.</p>
	</div>
</div>



<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117cac9a"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 4<br />
<sup>[3] </sup>Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 28<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[7]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[8]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[9]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117cae67"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a164117cafac"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/darling-river-conservation-initiative-site-8-hir-project/">Darling River Conservation Initiative Site 8 HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Darling River Eco Corridor 34 HIR Project</title>
		<link>https://greencollar.com.au/projects/darling-river-eco-corridor-34-hir-project/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Tue, 28 Nov 2023 23:58:06 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=10028</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/darling-river-eco-corridor-34-hir-project/">Darling River Eco Corridor 34 HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a164117cda85"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located North East of Bourke in NSW in the Mulga Lands bioregion. The land consists of flats and floodplains, and slightly undulating plains and sandy ridgesThe dominant species observed on the property from field surveys include Eremophila sturtii, Dodonaea viscosa, Eremophila mitchellii, Acacia aneura, Acacia harpophylla and Eucalyptus populnea.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands.  This is achieved by controlled grazing and feral animal management across the project area including fencing upgrades and water management. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (ERF121095) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c3) (the Determination) and generates Australian Carbon Credit Units (ACCUs).  This is the fifth version of the Human Induced Regeneration methodology.</p>
<p>The project has issued Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c3</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">14 May 2018</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">100 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">April 2008 – April 2018</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 January 2015</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">FullCAM 2016</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audit undertaken by registered Greenhouse and Energy Auditors which have confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the periods audited. The most recent audit report was issued on the 5 March 2019.</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Darling River Eco Corridor 34 HIR Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Darling River Eco Corridor 34 HIR Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 December 2018.<sup><a href="#footnotes" name="_ednref5">[6]</a></sup>.</p>
<p>A summary of the stratification of the Darling River Eco Corridor 34 HIR Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="49%"><strong>Project Area</strong></td>
<td width="49%">23,245 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref7"></a><a name="_ednref6"></a><a href="#footnotes"><sup>[7]</sup></a></td>
<td width="49%">49</td>
</tr>
<tr>
<td width="49%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="49%">4,236 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Total area excluded from CEA </strong></td>
<td width="49%">19,009 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="49%">10,340 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="49%">8,555 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="49%">114 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2048" width="1721" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_ProjectStrata.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_ProjectStrata-861x1024.png 861w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_ProjectStrata-1291x1536.png 1291w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_ProjectStrata-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas.  This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to validate the stratification of the Darling River Eco Corridor 34 HIR project in accordance with the Determination and Guidelines, GreenCollar carried out extensive field surveys and data collection. This included collection of data on existing vegetation species, stem density and vegetation height.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="945" width="794" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154320/ERF121095_GroundTruthWaypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154320/ERF121095_GroundTruthWaypoints.png 794w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154320/ERF121095_GroundTruthWaypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154320/ERF121095_GroundTruthWaypoints-768x914.png 768w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where ground truth surveys were conducted as part of the stratification process.</p>
<p>A <strong>Ground Truth</strong> <strong>Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a164117ced51" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="none"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="350" height="720" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_GT_Photo1.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_GT_Photo1.jpg 350w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_GT_Photo1-146x300.jpg 146w" sizes="auto, (max-width: 350px) 100vw, 350px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="350" height="720" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154317/ERF121095_GT_Photo2.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154317/ERF121095_GT_Photo2.jpg 350w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154317/ERF121095_GT_Photo2-146x300.jpg 146w" sizes="auto, (max-width: 350px) 100vw, 350px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>The Guidelines also require a map accuracy assessment be completed before offset reporting.  This assessment must include the field sample plots, which can be used in conjunction with remote sensing samples.  The Clean Energy Regulator will accept mapping accuracies at or above 85 per cent for pre-existing forest and forest potential classification types.  The overall accuracy of the Darling River Eco Corridor 34 classification was 86% which is greater than the 85% minimum requirement of The Guidelines.</p>
<p>After the completion of the map accuracy assessment, any additional exclusion areas were delineated prior to finalising the initial stratification. The extent of exclusion areas (totalling 19,009 ha), comprised of pre-existing forest cover (10,340 ha) and areas which classified as having no forest potential (8,555 ha). Through this process a final eligible CEA area of 4,236 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="945" width="794" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154323/ERF121095_SatImage.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154323/ERF121095_SatImage.png 794w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154323/ERF121095_SatImage-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154323/ERF121095_SatImage-768x914.png 768w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="945" width="794" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154321/ERF121095_CEA.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154321/ERF121095_CEA.png 794w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154321/ERF121095_CEA-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154321/ERF121095_CEA-768x914.png 768w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology requires using the Full Carbon Accounting Model (FullCAM) to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Darling River Eco Corridor 34 HIR project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="1527" width="2508" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154322/ERF121095_SeqCurve-scaled-e1701215721632.jpg" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154322/ERF121095_SeqCurve-scaled-e1701215721632.jpg 2508w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154322/ERF121095_SeqCurve-scaled-e1701215721632-300x183.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154322/ERF121095_SeqCurve-scaled-e1701215721632-1024x623.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154322/ERF121095_SeqCurve-scaled-e1701215721632-768x468.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154322/ERF121095_SeqCurve-scaled-e1701215721632-1536x935.jpg 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154322/ERF121095_SeqCurve-scaled-e1701215721632-2048x1247.jpg 2048w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154322/ERF121095_SeqCurve-scaled-e1701215721632-1320x804.jpg 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the landholder of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from landholder as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[7]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>Darling River Eco Corridor 34 HIR Project is set out below:</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[8]</a></sup></td>
<td width="359">14 May 2023</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[9]</a></sup></td>
<td width="359">14 May 2027</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[10]</a></sup></td>
<td width="359">14 May 2033</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Project Area Files</strong></h3>
<p>GIS shapefiles for the project can be downloaded <a href="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154319/ERF121095_ProjectStrata-1.zip">here</a>. These files detail the project stratification including the carbon estimation areas and exclusion areas.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117d0ee9"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 4<br />
<sup>[3] </sup>Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 28<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> The initial stratification was reported on prior to the public release of the Guidelines on stratification, evidence and records in May 2019, however draft material was available at this time. Additionally, the project is defined as an existing project in accordance with Section 9AA of the CFI Rule 2015.<br />
<sup>[7]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[8]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[9]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[10]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a164117d114f"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/darling-river-eco-corridor-34-hir-project/">Darling River Eco Corridor 34 HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Buckambool HIR Project</title>
		<link>https://greencollar.com.au/projects/buckambool-hir-project/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Tue, 28 Nov 2023 23:31:50 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=10014</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/buckambool-hir-project/">Buckambool HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a164117d3cb1"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located South West of Cobar in NSW in the Cobar Peneplain bioregion. The land consists of flat cropping country, rocky ridges and small gullies. The dominant species observed on the property from field surveys include Callitris glaucophylla, Eremophila mitchellii, Eremophila sturtii, Dodonaea viscosa and Eucalyptus populnea.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands.  This is achieved by controlled grazing and feral animal management across the project area along with fencing upgrades. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (EOP101263) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c1) (the Determination) and generates Australian Carbon Credit Units (ACCUs).  This is the third version of the Human Induced Regeneration methodology.</p>
<p>The project has issued both Kyoto ACCUs and non-Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c1</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">24 June 2015</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">100 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">January 2000 – December 2009</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 January 2010</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">Reforestation Modelling Tool</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audit undertaken by registered Greenhouse and Energy Auditors which has confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the periods audited. The most recent audit report was issued on the 26 May 2017.</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Buckambool HIR Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Buckambool HIR Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 December 2016.<sup><a href="#footnotes" name="_ednref6">[6]</a></sup></p>
<p>A summary of the stratification of the Buckambool HIR Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="49%"><strong>Project Area</strong></td>
<td width="49%">31,159 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref7"></a><a name="_ednref6"></a><a href="#footnotes"><sup>[7]</sup></a></td>
<td width="49%">1</td>
</tr>
<tr>
<td width="49%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="49%">9,402 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Total area excluded from CEA </strong></td>
<td width="49%">21,758 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="49%">13,301 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="49%">207 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="49%">8,250 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154335/EOP101263_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154335/EOP101263_ProjectStrata.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154335/EOP101263_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154335/EOP101263_ProjectStrata-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154335/EOP101263_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154335/EOP101263_ProjectStrata-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154335/EOP101263_ProjectStrata-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154335/EOP101263_ProjectStrata-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas. This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to inform the initial stratification of the Buckambool HIR Project in accordance with the Determination, GreenCollar carried out field surveys and data collection. This included collection of data on existing vegetation species, photos and a detailed site description.</p>
<p>Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas. The extent of exclusion areas (totalling 21,758 ha), comprised of pre-existing forest cover (13,301 ha) and areas which classified as having no forest potential (207 ha). Through this process a final eligible CEA area of 9,402 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154333/EOP101263_SatImage.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154333/EOP101263_SatImage.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154333/EOP101263_SatImage-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154333/EOP101263_SatImage-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154333/EOP101263_SatImage-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154333/EOP101263_SatImage-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154333/EOP101263_SatImage-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154333/EOP101263_SatImage-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117d4d0a"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154325/EOP101263_CEA.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154325/EOP101263_CEA.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154325/EOP101263_CEA-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154325/EOP101263_CEA-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154325/EOP101263_CEA-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154325/EOP101263_CEA-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154325/EOP101263_CEA-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154325/EOP101263_CEA-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div><div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology required using the Reforestation Modelling Tool to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Buckambool HIR project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="1271" width="2461" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154331/EOP101263_SeqCurve-scaled-e1701214062266.jpg" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154331/EOP101263_SeqCurve-scaled-e1701214062266.jpg 2461w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154331/EOP101263_SeqCurve-scaled-e1701214062266-300x155.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154331/EOP101263_SeqCurve-scaled-e1701214062266-1024x529.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154331/EOP101263_SeqCurve-scaled-e1701214062266-768x397.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154331/EOP101263_SeqCurve-scaled-e1701214062266-1536x793.jpg 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154331/EOP101263_SeqCurve-scaled-e1701214062266-2048x1058.jpg 2048w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154331/EOP101263_SeqCurve-scaled-e1701214062266-1320x682.jpg 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the landholder of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from landholder as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154327/EOP101263_BiomassWaypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154327/EOP101263_BiomassWaypoints.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154327/EOP101263_BiomassWaypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154327/EOP101263_BiomassWaypoints-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154327/EOP101263_BiomassWaypoints-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154327/EOP101263_BiomassWaypoints-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154327/EOP101263_BiomassWaypoints-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154327/EOP101263_BiomassWaypoints-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where vegetation biomass surveys were conducted as part of the monitoring process.</p>
<p>A <strong>Biomass Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a164117d634d" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="none"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154328/EOP101263_Biomass_Photo2-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154328/EOP101263_Biomass_Photo2-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154328/EOP101263_Biomass_Photo2-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154328/EOP101263_Biomass_Photo2-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154328/EOP101263_Biomass_Photo2.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154330/EOP101263_Biomass_Photo1-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154330/EOP101263_Biomass_Photo1-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154330/EOP101263_Biomass_Photo1-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154330/EOP101263_Biomass_Photo1-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154330/EOP101263_Biomass_Photo1.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[8]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>A summary of regeneration checks required for the Buckambool HIR Project is set out below:</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[9]</a></sup></td>
<td width="359">24 June 2020 – Completed</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[10]</a></sup></td>
<td width="359">24 June 2024</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[11]</a></sup></td>
<td width="359">24 June 2030</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>



<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<div id="fws_64b8acf4b8dd6" class="wpb_row vc_row-fluid vc_row vc_row-o-equal-height vc_row-flex vc_row-o-content-middle leftcontent-rightimg-row orange-links reverse_columns_column_phone " data-column-margin="40px" data-midnight="dark">
<div class="row_col_wrap_12 col span_12 dark left">
<div class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone " data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="wpb_text_column wpb_content_element ">
<div class="wpb_wrapper">
<h3><strong>Project Area Files</strong></h3>
<p>GIS shapefiles for the project can be downloaded <a href="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154337/EOP101263_ProjectFiles.zip">here</a>. These files detail the project stratification including the carbon estimation areas and exclusion areas.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div id="fws_64b8acf4be6e8" class="wpb_row vc_row-fluid vc_row " data-column-margin="default" data-midnight="dark">
<div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false">
<div class="inner-wrap">
<div class="row-bg"></div>
</div>
</div>
</div>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117d74e1"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 1.3<br />
<sup>[3]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 4.5<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> The initial stratification was reported on prior to the public release of the Guidelines on stratification, evidence and records in May 2019. These guidelines also set out administrative arrangements for projects that have previously reported, including a pragmatic approach that will be taken in situations where additional evidence is required to meet these guidelines. Additionally, the project is defined as an existing project in accordance with Section 9AA of the CFI Rule 2015.<br />
<sup>[7]</sup> Supplementary Guidance from the Clean Energy Regulator on 19 November 2014 allows participants to choose to combine several CEAs into one CEA. For example, where small CEAs are located next to each other and share common features.<br />
<sup>[8]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[9]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[10]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[11]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a164117d76a4"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/buckambool-hir-project/">Buckambool HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Myroolia HIR Project</title>
		<link>https://greencollar.com.au/projects/myroolia-hir-project/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Tue, 28 Nov 2023 23:16:40 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=9999</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/myroolia-hir-project/">Myroolia HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a164117da247"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located West of Bourke in NSW in the Mulga Lands bioregion. The land consists of undulating red soils and floodplains from the Warrego creek. The dominant species observed on the property from field surveys include Eremophila sturtii, Dodonaea viscosa, Eremophila mitchellii, Acacia victoriae, Acacia tetragonophylla, Acacia cambagei and Acacia aneura.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands. This is achieved by controlled grazing and feral animal management across the project area along with fencing upgrades. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (EOP101262) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c1) (the Determination) and generates Australian Carbon Credit Units (ACCUs). This is the third version of the Human Induced Regeneration methodology.</p>
<p>The project has issued both Kyoto ACCUs and non-Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c1</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">24 June 2015</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">100 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">January 1998 – December 2007</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 July 2008</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">Reforestation Modelling Tool</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audit undertaken by registered Greenhouse and Energy Auditors which has confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the period audited. The most recent audit report was issued on the 1 January 2016.</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Myroolia HIR Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Myroolia HIR Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 December 2015.<sup><a href="#footnotes" name="_ednref6">[6]</a></sup></p>
<p>A summary of the stratification of the Myroolia HIR Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="49%"><strong>Project Area</strong></td>
<td width="49%">28,015 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref7"></a><a name="_ednref6"></a><a href="#footnotes"><sup>[7]</sup></a></td>
<td width="49%">2</td>
</tr>
<tr>
<td width="49%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="49%">17,842 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Total area excluded from CEA </strong></td>
<td width="49%">10,174 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="49%">2,155 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="49%">7,999 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="49%">20 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154343/EOP101262_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154343/EOP101262_ProjectStrata.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154343/EOP101262_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154343/EOP101262_ProjectStrata-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154343/EOP101262_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154343/EOP101262_ProjectStrata-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154343/EOP101262_ProjectStrata-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154343/EOP101262_ProjectStrata-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas. This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to inform the initial stratification of the Myroolia HIR Project in accordance with the Determination, GreenCollar carried out field surveys and data collection. This included collection of data on existing vegetation species, photos and a detailed site description.</p>
<p>Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas. The extent of exclusion areas (totalling 10,174 ha), comprised of pre-existing forest cover (2,155 ha) and areas which classified as having no forest potential (7,999 ha). Through this process a final eligible CEA area of 17,842 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154340/EOP101262_SatImage.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154340/EOP101262_SatImage.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154340/EOP101262_SatImage-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154340/EOP101262_SatImage-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154340/EOP101262_SatImage-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154340/EOP101262_SatImage-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154340/EOP101262_SatImage-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154340/EOP101262_SatImage-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117db16c"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154344/EOP101262_CEA.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154344/EOP101262_CEA.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154344/EOP101262_CEA-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154344/EOP101262_CEA-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154344/EOP101262_CEA-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154344/EOP101262_CEA-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154344/EOP101262_CEA-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154344/EOP101262_CEA-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div><div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology required using the Reforestation Modelling Tool to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Myroolia HIR project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2236" width="4147" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154339/EOP101262_SeqCurve.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154339/EOP101262_SeqCurve.png 4147w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154339/EOP101262_SeqCurve-300x162.png 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154339/EOP101262_SeqCurve-1024x552.png 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154339/EOP101262_SeqCurve-768x414.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154339/EOP101262_SeqCurve-1536x828.png 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154339/EOP101262_SeqCurve-2048x1104.png 2048w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154339/EOP101262_SeqCurve-1320x712.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the landholder of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from landholder as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154346/EOP101262_BiomassWaypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154346/EOP101262_BiomassWaypoints.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154346/EOP101262_BiomassWaypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154346/EOP101262_BiomassWaypoints-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154346/EOP101262_BiomassWaypoints-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154346/EOP101262_BiomassWaypoints-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154346/EOP101262_BiomassWaypoints-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154346/EOP101262_BiomassWaypoints-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where vegetation biomass surveys were conducted as part of the monitoring process.</p>
<p>A <strong>Biomass Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a164117dccdd" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="none"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="768" height="1024" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154347/EOP101262_Biomass_Photo2-768x1024.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154347/EOP101262_Biomass_Photo2-768x1024.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154347/EOP101262_Biomass_Photo2-225x300.jpg 225w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154347/EOP101262_Biomass_Photo2-1152x1536.jpg 1152w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154347/EOP101262_Biomass_Photo2-1320x1760.jpg 1320w" sizes="auto, (max-width: 768px) 100vw, 768px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="768" height="1024" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154338/EOP101262_Biomass_Photo1-768x1024.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154338/EOP101262_Biomass_Photo1-768x1024.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154338/EOP101262_Biomass_Photo1-225x300.jpg 225w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154338/EOP101262_Biomass_Photo1-1152x1536.jpg 1152w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154338/EOP101262_Biomass_Photo1-1320x1760.jpg 1320w" sizes="auto, (max-width: 768px) 100vw, 768px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[8]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>A summary of regeneration checks required for the Myroolia HIR Project is set out below:</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[9]</a></sup></td>
<td width="359">24 June 2020 – Completed</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[10]</a></sup></td>
<td width="359">24 June 2024</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[11]</a></sup></td>
<td width="359">24 June 2030</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>



<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<div id="fws_64b8acf4b8dd6" class="wpb_row vc_row-fluid vc_row vc_row-o-equal-height vc_row-flex vc_row-o-content-middle leftcontent-rightimg-row orange-links reverse_columns_column_phone " data-column-margin="40px" data-midnight="dark">
<div class="row_col_wrap_12 col span_12 dark left">
<div class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone " data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="wpb_text_column wpb_content_element ">
<div class="wpb_wrapper">
<h3><strong>Project Area Files</strong></h3>
<p>GIS shapefiles for the project can be downloaded <a href="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/11/04154344/EOP101262_ProjectFiles.zip">here</a>. These files detail the project stratification including the carbon estimation areas and exclusion areas.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div id="fws_64b8acf4be6e8" class="wpb_row vc_row-fluid vc_row " data-column-margin="default" data-midnight="dark">
<div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false">
<div class="inner-wrap">
<div class="row-bg"></div>
</div>
</div>
</div>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117de7a8"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 1.3<br />
<sup>[3]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 4.5<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> The initial stratification was reported on prior to the public release of the Guidelines on stratification, evidence and records in May 2019. These guidelines also set out administrative arrangements for projects that have previously reported, including a pragmatic approach that will be taken in situations where additional evidence is required to meet these guidelines. Additionally, the project is defined as an existing project in accordance with Section 9AA of the CFI Rule 2015.<br />
<sup>[7]</sup> Supplementary Guidance from the Clean Energy Regulator on 19 November 2014 allows participants to choose to combine several CEAs into one CEA. For example, where small CEAs are located next to each other and share common features.<br />
<sup>[8]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[9]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[10]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[11]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a164117dea87"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/myroolia-hir-project/">Myroolia HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Boonora Downs HIR Project</title>
		<link>https://greencollar.com.au/projects/erf101674/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Thu, 20 Jul 2023 04:38:39 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=8454</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/erf101674/">Boonora Downs HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a164117e2952"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located West of Cobar in NSW in the Cobar Peneplain bioregion. The land consists of undulating ridges interspersed with creeks and flood country. The dominant species observed on the property from field surveys include Dodonaea viscosa, Eremophila sturtii, Eremophila mitchellii, Eucalyptus intertexta and Acacia aneura.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands.  This is achieved by controlled grazing and feral animal management across the project area along with fencing upgrades. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (ERF101674) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c1) (the Determination) and generates Australian Carbon Credit Units (ACCUs).  This is the third version of the Human Induced Regeneration methodology.</p>
<p>The project has issued both Kyoto ACCUs and non-Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c1</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">10 July 2015</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">100 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">January 2000 – December 2009</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 January 2010</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">Reforestation Modelling Tool</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audit undertaken by registered Greenhouse and Energy Auditors which has confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the periods audited. The most recent audit report was issued on the 3 June 2016.</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Boonora Downs HIR Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Boonora Downs HIR Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 March 2016.<sup><a href="#footnotes" name="_ednref6">[6]</a></sup></p>
<p>A summary of the stratification of the Boonora Downs HIR Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="49%"><strong>Project Area</strong></td>
<td width="50%">12,066 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref6"></a><a name="_ednref7"></a><a href="#footnotes"><sup>[7]</sup></a></td>
<td width="50%">1</td>
</tr>
<tr>
<td width="49%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="50%">8,027 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Total area excluded from CEA </strong></td>
<td width="50%">4,039 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="50%">1,417 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="50%">38 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="50%">2,584 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154742/ERF101674_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154742/ERF101674_ProjectStrata.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154742/ERF101674_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154742/ERF101674_ProjectStrata-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154742/ERF101674_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154742/ERF101674_ProjectStrata-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154742/ERF101674_ProjectStrata-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154742/ERF101674_ProjectStrata-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas. This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to inform the initial stratification of the Boonora Downs HIR Project in accordance with the Determination, GreenCollar carried out field surveys and data collection. This included collection of data on existing vegetation species, photos and a detailed site description.</p>
<p>Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas. The extent of exclusion areas (totalling 4,039 ha), comprised of pre-existing forest cover (1,417 ha) and areas which classified as having no forest potential (38 ha). Through this process a final eligible CEA area of 8,027 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154740/ERF101674_SatImage.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154740/ERF101674_SatImage.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154740/ERF101674_SatImage-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154740/ERF101674_SatImage-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154740/ERF101674_SatImage-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154740/ERF101674_SatImage-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154740/ERF101674_SatImage-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154740/ERF101674_SatImage-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117e38ac"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154743/ERF101674_CEA.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154743/ERF101674_CEA.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154743/ERF101674_CEA-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154743/ERF101674_CEA-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154743/ERF101674_CEA-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154743/ERF101674_CEA-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154743/ERF101674_CEA-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154743/ERF101674_CEA-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div><div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology required using the Reforestation Modelling Tool to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Boonora Downs HIR project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="1380" width="2560" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154734/ERF101674_SeqCurve-1-scaled.jpg" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154734/ERF101674_SeqCurve-1-scaled.jpg 2560w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154734/ERF101674_SeqCurve-1-300x162.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154734/ERF101674_SeqCurve-1-1024x552.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154734/ERF101674_SeqCurve-1-768x414.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154734/ERF101674_SeqCurve-1-1536x828.jpg 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154734/ERF101674_SeqCurve-1-2048x1104.jpg 2048w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154734/ERF101674_SeqCurve-1-1320x712.jpg 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the landholder of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from landholder as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154735/ERF101674_BiomassWaypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154735/ERF101674_BiomassWaypoints.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154735/ERF101674_BiomassWaypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154735/ERF101674_BiomassWaypoints-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154735/ERF101674_BiomassWaypoints-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154735/ERF101674_BiomassWaypoints-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154735/ERF101674_BiomassWaypoints-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154735/ERF101674_BiomassWaypoints-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where vegetation biomass surveys were conducted as part of the monitoring process.</p>
<p>A <strong>Biomass Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a164117e4e71" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="none"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154736/ERF101674_Biomass_Photo2-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154736/ERF101674_Biomass_Photo2-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154736/ERF101674_Biomass_Photo2-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154736/ERF101674_Biomass_Photo2-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154736/ERF101674_Biomass_Photo2.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154737/ERF101674_Biomass_Photo1-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154737/ERF101674_Biomass_Photo1-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154737/ERF101674_Biomass_Photo1-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154737/ERF101674_Biomass_Photo1-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154737/ERF101674_Biomass_Photo1.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[8]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>A summary of regeneration checks required for the Boonora Downs HIR Project is set out below:</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[9]</a></sup></td>
<td width="359">10 July 2020 – Completed</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[10]</a></sup></td>
<td width="359">10 July 2024</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[11]</a></sup></td>
<td width="359">10 July 2030</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>



<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<div id="fws_64b8acf4b8dd6" class="wpb_row vc_row-fluid vc_row vc_row-o-equal-height vc_row-flex vc_row-o-content-middle leftcontent-rightimg-row orange-links reverse_columns_column_phone " data-column-margin="40px" data-midnight="dark">
<div class="row_col_wrap_12 col span_12 dark left">
<div class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone " data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="wpb_text_column wpb_content_element ">
<div class="wpb_wrapper">
<h3><strong>Project Area Files</strong></h3>
<p>GIS shapefiles for the project can be downloaded <a href="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154743/ERF101674_ProjectFiles.zip">here</a>. These files detail the project stratification including the carbon estimation areas and exclusion areas.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div id="fws_64b8acf4be6e8" class="wpb_row vc_row-fluid vc_row " data-column-margin="default" data-midnight="dark">
<div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false">
<div class="inner-wrap">
<div class="row-bg"></div>
</div>
</div>
</div>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117e607b"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 1.3<br />
<sup>[3]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 4.5<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> The initial stratification was reported on prior to the public release of the Guidelines on stratification, evidence and records in May 2019. These guidelines also set out administrative arrangements for projects that have previously reported, including a pragmatic approach that will be taken in situations where additional evidence is required to meet these guidelines. Additionally, the project is defined as an existing project in accordance with Section 9AA of the CFI Rule 2015.<br />
<sup>[7]</sup> Supplementary Guidance from the Clean Energy Regulator on 19 November 2014 allows participants to choose to combine several CEAs into one CEA. For example, where small CEAs are located next to each other and share common features.<br />
<sup>[8]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[9]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[10]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[11]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a164117e6218"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/erf101674/">Boonora Downs HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Darling River Eco Corridor 8 HIR Project</title>
		<link>https://greencollar.com.au/projects/erf103326/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Thu, 20 Jul 2023 04:13:15 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=8442</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/erf103326/">Darling River Eco Corridor 8 HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a164117e8dd6"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located North West of Bourke in NSW in the Mulga Lands bioregion. The land consists of gently undulating terrain and stony ridges. The dominant species observed on the property from field surveys include Eremophila sturtii, Acacia aneura, Eremophila mitchellii, Eucalyptus populnea, Dodonaea viscosa and Flindersia maculosa.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands.  This is achieved by controlled grazing and feral animal management across the project area including fencing upgrades and water management. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (ERF103326) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c2) (the Determination) and generates Australian Carbon Credit Units (ACCUs).  This is the fourth version of the Human Induced Regeneration methodology.</p>
<p>The project has issued Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c2</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">18 April 2016</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">100 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">March 2006 – March 2016</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 July 2015</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">FullCAM 2016</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audit undertaken by registered Greenhouse and Energy Auditors which have confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the periods audited. The most recent audit report was issued on the 29 May 2018.</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Darling River Eco Corridor 8 HIR Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Darling River Eco Corridor 8 HIR Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 March 2018.<sup><a href="#footnotes" name="_ednref5">[6]</a></sup>.</p>
<p>A summary of the stratification of the Darling River Eco Corridor 8 HIR Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="50%"><strong>Project Area</strong></td>
<td width="50%">17,642 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref6"></a><a name="_ednref7"></a><a href="#footnotes"><sup>[7]</sup></a></td>
<td width="50%">36</td>
</tr>
<tr>
<td width="50%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="50%">11,293 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Total area excluded from CEA </strong></td>
<td width="50%">6,350 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="50%">4,047 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="50%">2,214 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="50%">89 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154748/ERF103326_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154748/ERF103326_ProjectStrata.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154748/ERF103326_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154748/ERF103326_ProjectStrata-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154748/ERF103326_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154748/ERF103326_ProjectStrata-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154748/ERF103326_ProjectStrata-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154748/ERF103326_ProjectStrata-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas.  This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to inform the initial stratification of the Darling River Eco Corridor 8 HIR project in accordance with the Determination, GreenCollar carried out field surveys and data collection.  This included collection of data on existing vegetation species, photos and a detailed site description.</p>
<p>Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas. The extent of exclusion areas (totalling 6,350 ha), comprised of pre-existing forest cover (4,047 ha) and areas which classified as having no forest potential (2,214 ha). Through this process a final eligible CEA area of 11,293 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154746/ERF103326_SatImage.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154746/ERF103326_SatImage.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154746/ERF103326_SatImage-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154746/ERF103326_SatImage-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154746/ERF103326_SatImage-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154746/ERF103326_SatImage-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154746/ERF103326_SatImage-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154746/ERF103326_SatImage-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154750/ERF103326_CEAs.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154750/ERF103326_CEAs.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154750/ERF103326_CEAs-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154750/ERF103326_CEAs-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154750/ERF103326_CEAs-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154750/ERF103326_CEAs-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154750/ERF103326_CEAs-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154750/ERF103326_CEAs-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology requires using the Full Carbon Accounting Model (FullCAM) to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Darling River Eco Corridor 8 HIR project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="1380" width="2560" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154744/ERF103326_SeqCurve-1-scaled.jpg" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154744/ERF103326_SeqCurve-1-scaled.jpg 2560w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154744/ERF103326_SeqCurve-1-300x162.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154744/ERF103326_SeqCurve-1-1024x552.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154744/ERF103326_SeqCurve-1-768x414.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154744/ERF103326_SeqCurve-1-1536x828.jpg 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154744/ERF103326_SeqCurve-1-2048x1104.jpg 2048w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154744/ERF103326_SeqCurve-1-1320x712.jpg 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the landholder of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from landholder as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154752/ERF103326_BiomassWaypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154752/ERF103326_BiomassWaypoints.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154752/ERF103326_BiomassWaypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154752/ERF103326_BiomassWaypoints-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154752/ERF103326_BiomassWaypoints-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154752/ERF103326_BiomassWaypoints-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154752/ERF103326_BiomassWaypoints-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154752/ERF103326_BiomassWaypoints-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where vegetation biomass surveys were conducted as part of the monitoring process.</p>
<p>A <strong>Biomass Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a164117eb036" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="pagination"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154755/ERF103326_Biomass_Photo1-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154755/ERF103326_Biomass_Photo1-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154755/ERF103326_Biomass_Photo1-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154755/ERF103326_Biomass_Photo1-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154755/ERF103326_Biomass_Photo1.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154753/ERF103326_Biomass_Photo2-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154753/ERF103326_Biomass_Photo2-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154753/ERF103326_Biomass_Photo2-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154753/ERF103326_Biomass_Photo2-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154753/ERF103326_Biomass_Photo2.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[7]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>A summary of regeneration checks required for the Darling River Eco Corridor 8 HIR Project is set out below:</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[8]</a></sup></td>
<td width="359">18 April 2021– Completed</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[9]</a></sup></td>
<td width="359">18 April 2025</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[10]</a></sup></td>
<td width="359">18 April 2031</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Project Area Files</strong></h3>
<p>GIS shapefiles for the project can be downloaded <a href="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154750/ERF103326_ProjectFiles.zip">here</a>. These files detail the project stratification including the carbon estimation areas and exclusion areas.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117ec358"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 4<br />
<sup>[3] </sup>Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 28<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> The initial stratification was reported on prior to the public release of the Guidelines on stratification, evidence and records in May 2019. These guidelines also set out administrative arrangements for projects that have previously reported, including a pragmatic approach that will be taken in situations where additional evidence is required to meet these guidelines. Additionally, the project is defined as an existing project in accordance with Section 9AA of the CFI Rule 2015.<br />
<sup>[7]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[8]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[9]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[10]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a164117ec4ec"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/erf103326/">Darling River Eco Corridor 8 HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Lynwood HIR Project</title>
		<link>https://greencollar.com.au/projects/erf101280/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Thu, 20 Jul 2023 03:51:41 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=8426</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/erf101280/">Lynwood HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a164117eef8e"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located North West of Cobar in NSW in the Cobar Peneplain bioregion. The land consists of rocky ridges and undulating sandy plains. The dominant species observed on the property from field surveys include Dodonaea viscosa, Eremophila sturtii, Eremophila mitchellii, Eucalyptus populnea and Callitris glaucophylla.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands.  This is achieved by controlled grazing and feral animal management across the project area along with fencing upgrades. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (ERF101280) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c1) (the Determination) and generates Australian Carbon Credit Units (ACCUs).  This is the third version of the Human Induced Regeneration methodology.</p>
<p>The project has issued both Kyoto ACCUs and non-Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c1</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">24 June 2015</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">100 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">July 1997 – June 2007</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 July 2008</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">Reforestation Modelling Tool</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audit undertaken by registered Greenhouse and Energy Auditors which has confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the period audited. The most recent audit report was issued on the 17 August 2016</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Lynwood HIR Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Lynwood HIR Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 March 2016.<sup><a href="#footnotes" name="_ednref6">[6]</a></sup></p>
<p>A summary of the stratification of the Lynwood HIR Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="50%"><strong>Project Area</strong></td>
<td width="50%">46,670 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref6"></a><a name="_ednref7"></a><a href="#footnotes"><sup>[7]</sup></a></td>
<td width="50%">1</td>
</tr>
<tr>
<td width="50%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="50%">25,326 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Total area excluded from CEA </strong></td>
<td width="50%">21,344 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="50%">2,969 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="50%">2,643 hectares</td>
</tr>
<tr>
<td width="50%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="50%">15,732 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154803/ERF101280_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154803/ERF101280_ProjectStrata.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154803/ERF101280_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154803/ERF101280_ProjectStrata-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154803/ERF101280_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154803/ERF101280_ProjectStrata-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154803/ERF101280_ProjectStrata-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154803/ERF101280_ProjectStrata-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas. This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to inform the initial stratification of the Lynwood HIR Project in accordance with the Determination, GreenCollar carried out field surveys and data collection. This included collection of data on existing vegetation species, photos and a detailed site description.</p>
<p>Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas. The extent of exclusion areas (totalling 21,344 ha), comprised of pre-existing forest cover (2,969 ha) and areas which classified as having no forest potential (2,643 ha). Through this process a final eligible CEA area of 25,326 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154758/ERF101280_SatImage-1.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154758/ERF101280_SatImage-1.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154758/ERF101280_SatImage-1-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154758/ERF101280_SatImage-1-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154758/ERF101280_SatImage-1-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154758/ERF101280_SatImage-1-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154758/ERF101280_SatImage-1-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154758/ERF101280_SatImage-1-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117effa1"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154757/ERF101280_CEA-1.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154757/ERF101280_CEA-1.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154757/ERF101280_CEA-1-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154757/ERF101280_CEA-1-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154757/ERF101280_CEA-1-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154757/ERF101280_CEA-1-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154757/ERF101280_CEA-1-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154757/ERF101280_CEA-1-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div><div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology required using the Reforestation Modelling Tool to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Lynwood HIR project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2236" width="4147" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154809/ERF101280_SeqCurve.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154809/ERF101280_SeqCurve.png 4147w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154809/ERF101280_SeqCurve-300x162.png 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154809/ERF101280_SeqCurve-1024x552.png 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154809/ERF101280_SeqCurve-768x414.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154809/ERF101280_SeqCurve-1536x828.png 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154809/ERF101280_SeqCurve-2048x1104.png 2048w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154809/ERF101280_SeqCurve-1320x712.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the landholder of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from landholder as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154805/ERF101280_BiomassWaypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154805/ERF101280_BiomassWaypoints.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154805/ERF101280_BiomassWaypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154805/ERF101280_BiomassWaypoints-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154805/ERF101280_BiomassWaypoints-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154805/ERF101280_BiomassWaypoints-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154805/ERF101280_BiomassWaypoints-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154805/ERF101280_BiomassWaypoints-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where vegetation biomass surveys were conducted as part of the monitoring process.</p>
<p>A <strong>Biomass Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a164117f16ab" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="none"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154807/ERF101280_Biomass_Photo2-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154807/ERF101280_Biomass_Photo2-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154807/ERF101280_Biomass_Photo2-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154807/ERF101280_Biomass_Photo2-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154807/ERF101280_Biomass_Photo2.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154808/ERF101280_Biomass_Photo1-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154808/ERF101280_Biomass_Photo1-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154808/ERF101280_Biomass_Photo1-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154808/ERF101280_Biomass_Photo1-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154808/ERF101280_Biomass_Photo1.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[8]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>See below for the average per hectare sequestration for the Lynwood HIR project.</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[9]</a></sup></td>
<td width="359">24 June 2020 – Completed</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[10]</a></sup></td>
<td width="359">24 June 2024</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[11]</a></sup></td>
<td width="359">24 June 2030</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>



<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<div id="fws_64b8acf4b8dd6" class="wpb_row vc_row-fluid vc_row vc_row-o-equal-height vc_row-flex vc_row-o-content-middle leftcontent-rightimg-row orange-links reverse_columns_column_phone " data-column-margin="40px" data-midnight="dark">
<div class="row_col_wrap_12 col span_12 dark left">
<div class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone " data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="wpb_text_column wpb_content_element ">
<div class="wpb_wrapper">
<h3><strong>Project Area Files</strong></h3>
<p>GIS shapefiles for the project can be downloaded <a href="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/07/04154805/ERF101280_ProjectFiles.zip">here</a>. These files detail the project stratification including the carbon estimation areas and exclusion areas.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div id="fws_64b8acf4be6e8" class="wpb_row vc_row-fluid vc_row " data-column-margin="default" data-midnight="dark">
<div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false">
<div class="inner-wrap">
<div class="row-bg"></div>
</div>
</div>
</div>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164117f28be"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 1.3<br />
<sup>[3]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 4.5<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> The initial stratification was reported on prior to the public release of the Guidelines on stratification, evidence and records in May 2019. These guidelines also set out administrative arrangements for projects that have previously reported, including a pragmatic approach that will be taken in situations where additional evidence is required to meet these guidelines. Additionally, the project is defined as an existing project in accordance with Section 9AA of the CFI Rule 2015.<br />
<sup>[7]</sup> Supplementary Guidance from the Clean Energy Regulator on 19 November 2014 allows participants to choose to combine several CEAs into one CEA. For example, where small CEAs are located next to each other and share common features.<br />
<sup>[8]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[9]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[10]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[11]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a164117f2a4b"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/erf101280/">Lynwood HIR Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Paroo River Ecosystem Restoration Project</title>
		<link>https://greencollar.com.au/projects/erf103139/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Wed, 14 Jun 2023 04:21:56 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=8117</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/erf103139/">Paroo River Ecosystem Restoration Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a16411801850"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located North West of Bourke in NSW in the Mulga Lands bioregion. The land consists of red sandy country with stony ridges and clay pans.  The dominant species observed on the property from field surveys include Senna artemisioides, Dodonaea viscosa, Acacia aneura and Eremophila sturtii.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands.  This is achieved by controlled grazing and feral animal management across the project area including fencing upgrades and water management. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (ERF103139) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c2) (the Determination) and generates Australian Carbon Credit Units (ACCUs).  This is the fourth version of the Human Induced Regeneration methodology.</p>
<p>The project has issued Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c2</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">09 June 2016</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">100 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">February 2006 – February 2016</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 July 2010</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">FullCAM 2016</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audit undertaken by registered Greenhouse and Energy Auditors which has confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the periods audited. The most recent audit report was issued on the 29 May 2018.</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Paroo River Ecosystem Restoration Project HIR Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Paroo River Ecosystem Restoration Project HIR Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 March 2018.<sup><a href="#footnotes" name="_ednref5">[6]</a></sup>.</p>
<p>A summary of the stratification of the Paroo River Ecosystem Restoration Project HIR Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="49%"><strong>Project Area</strong></td>
<td width="49%">25,225 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref7"></a></td>
<td width="49%">20</td>
</tr>
<tr>
<td width="49%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="49%">10,220 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Total area excluded from CEA </strong></td>
<td width="49%">15,006 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="49%">3,729 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="49%">561 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="49%">10,719 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155022/ERF103139_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155022/ERF103139_ProjectStrata.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155022/ERF103139_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155022/ERF103139_ProjectStrata-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155022/ERF103139_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155022/ERF103139_ProjectStrata-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155022/ERF103139_ProjectStrata-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155022/ERF103139_ProjectStrata-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas. This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to inform the initial stratification of the Paroo River Ecosystem Restoration Project HIR project in accordance with the Determination, GreenCollar carried out field surveys and data collection. This included collection of data on existing vegetation species, photos and a detailed site description.</p>
<p>Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas. The extent of exclusion areas (totalling 15,006 ha), comprised of pre-existing forest cover (3,729 ha) and areas which classified as having no forest potential (561 ha). Through this process a final eligible CEA area of 10,220 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155020/ERF103139_SatImage.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155020/ERF103139_SatImage.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155020/ERF103139_SatImage-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155020/ERF103139_SatImage-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155020/ERF103139_SatImage-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155020/ERF103139_SatImage-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155020/ERF103139_SatImage-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155020/ERF103139_SatImage-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155015/ERF103139_CEA.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155015/ERF103139_CEA.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155015/ERF103139_CEA-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155015/ERF103139_CEA-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155015/ERF103139_CEA-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155015/ERF103139_CEA-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155015/ERF103139_CEA-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155015/ERF103139_CEA-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology requires using the Full Carbon Accounting Model (FullCAM) to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Paroo River Ecosystem Restoration Project HIR project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="913" width="1627" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155014/ERF103139_SeqCurve.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155014/ERF103139_SeqCurve.png 1627w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155014/ERF103139_SeqCurve-300x168.png 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155014/ERF103139_SeqCurve-1024x575.png 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155014/ERF103139_SeqCurve-768x431.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155014/ERF103139_SeqCurve-1536x862.png 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155014/ERF103139_SeqCurve-1320x741.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the landholder of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from landholder as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155016/ERF103139_Biomasswaypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155016/ERF103139_Biomasswaypoints.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155016/ERF103139_Biomasswaypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155016/ERF103139_Biomasswaypoints-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155016/ERF103139_Biomasswaypoints-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155016/ERF103139_Biomasswaypoints-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155016/ERF103139_Biomasswaypoints-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155016/ERF103139_Biomasswaypoints-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where vegetation biomass surveys were conducted as part of the monitoring process.</p>
<p>A <strong>Biomass Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a16411804596" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="none"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="576" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155018/ERF103139_Biomass_Photo2-1024x576.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155018/ERF103139_Biomass_Photo2-1024x576.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155018/ERF103139_Biomass_Photo2-300x169.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155018/ERF103139_Biomass_Photo2-768x432.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155018/ERF103139_Biomass_Photo2.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="576" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155019/ERF103139_Biomass_Photo1-1024x576.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155019/ERF103139_Biomass_Photo1-1024x576.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155019/ERF103139_Biomass_Photo1-300x169.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155019/ERF103139_Biomass_Photo1-768x432.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155019/ERF103139_Biomass_Photo1.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[7]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>A summary of regeneration checks required for the Paroo River Ecosystem Restoration Project HIR Project is set out below:</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[8]</a></sup></td>
<td width="359">09 June 2021 – Completed</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[9]</a></sup></td>
<td width="359">09 June 2025</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[10]</a></sup></td>
<td width="359">09 June 2031</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Project Area Files</strong></h3>
<p>GIS shapefiles for the project can be downloaded <a href="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155023/ERF103139_ProjectFiles.zip">here</a>. These files detail the project stratification including the carbon estimation areas and exclusion areas.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a16411805d88"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 4<br />
<sup>[3] </sup>Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 28<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> The initial stratification was reported on prior to the public release of the Guidelines on stratification, evidence and records in May 2019. These guidelines also set out administrative arrangements for projects that have previously reported, including a pragmatic approach that will be taken in situations where additional evidence is required to meet these guidelines. Additionally, the project is defined as an existing project in accordance with Section 9AA of the CFI Rule 2015.<br />
<sup>[7]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[8]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[9]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[10]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a16411805ff4"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/erf103139/">Paroo River Ecosystem Restoration Project</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Avondale</title>
		<link>https://greencollar.com.au/projects/erf165905/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Wed, 14 Jun 2023 04:20:56 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=8114</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/erf165905/">Avondale</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a16411808acb"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located West of Bourke in NSW in the Mulga Lands bioregion. The land consists of undulating and flat terrain with scattered salt lakes. The dominant species observed on the property from field surveys include Eremophila sturtii, Dodonaea viscosa, Acacia melvillei, Eremophila longifolia and Acacia aneura.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands.  This is achieved by controlled grazing and feral animal management across the project area including fencing upgrades and water management. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (ERF165905) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c3) (the Determination) and generates Australian Carbon Credit Units (ACCUs).  This is the fifth version of the Human Induced Regeneration methodology.</p>
<p>The project has issued Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c3</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">01 September 2021</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">25 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">July 2011 – June 2021</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 January 2019</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">FullCAM 2020</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audit undertaken by registered Greenhouse and Energy Auditors which have confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the periods audited. The most recent audit report was issued on the 31 October 2022.</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Avondale Human Induced Regeneration Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Avondale Human Induced Regeneration Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 July 2022.</p>
<p>A summary of the stratification of the Avondale Human Induced Regeneration Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="49%"><strong>Project Area</strong></td>
<td width="49%">35,460 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref7"></a></td>
<td width="49%">91</td>
</tr>
<tr>
<td width="49%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="49%">18,235 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Total area excluded from CEA </strong></td>
<td width="49%">17,225 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="49%">5,303 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="49%">6,467 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="49%">5,456 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155030/ERF165905_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155030/ERF165905_ProjectStrata.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155030/ERF165905_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155030/ERF165905_ProjectStrata-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155030/ERF165905_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155030/ERF165905_ProjectStrata-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155030/ERF165905_ProjectStrata-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155030/ERF165905_ProjectStrata-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas. This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to validate the stratification of the Avondale Human Induced Regeneration Project in accordance with the Determination and Guidelines, GreenCollar carried out extensive field surveys and data collection.  This included collection of data on existing vegetation species, stem density and vegetation height.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155031/ERF165905_GTWaypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155031/ERF165905_GTWaypoints.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155031/ERF165905_GTWaypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155031/ERF165905_GTWaypoints-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155031/ERF165905_GTWaypoints-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155031/ERF165905_GTWaypoints-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155031/ERF165905_GTWaypoints-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155031/ERF165905_GTWaypoints-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where vegetation biomass surveys were conducted as part of the monitoring process.</p>
<p>A <strong>Biomass Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a16411809d8b" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="none"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155034/ERF165905_GT_Photo2-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155034/ERF165905_GT_Photo2-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155034/ERF165905_GT_Photo2-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155034/ERF165905_GT_Photo2-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155034/ERF165905_GT_Photo2.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155036/ERF165905_GT_Photo1-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155036/ERF165905_GT_Photo1-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155036/ERF165905_GT_Photo1-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155036/ERF165905_GT_Photo1-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155036/ERF165905_GT_Photo1.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>The Guidelines also require a map accuracy assessment be completed before offset reporting.  This assessment must include the field sample plots, which can be used in conjunction with remote sensing samples.  The Clean Energy Regulator will accept mapping accuracies at or above 85 per cent for pre-existing forest and forest potential classification types.  The overall accuracy of the Avondale Human Induced Regeneration Project classification was 90.15% which is greater than the 85% minimum requirement of The Guidelines.</p>
<p>After the completion of the map accuracy assessment, any additional exclusion areas were delineated prior to finalising the initial stratification. The extent of exclusion areas (totalling 17,225 ha), comprised of pre-existing forest cover (5,303 ha) and areas which classified as having no forest potential (6,467 ha). Through this process a final eligible CEA area of 18,235 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155027/ERF165905_SatImage.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155027/ERF165905_SatImage.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155027/ERF165905_SatImage-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155027/ERF165905_SatImage-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155027/ERF165905_SatImage-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155027/ERF165905_SatImage-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155027/ERF165905_SatImage-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155027/ERF165905_SatImage-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155024/ERF165905_CEA.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155024/ERF165905_CEA.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155024/ERF165905_CEA-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155024/ERF165905_CEA-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155024/ERF165905_CEA-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155024/ERF165905_CEA-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155024/ERF165905_CEA-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155024/ERF165905_CEA-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology requires using the Full Carbon Accounting Model (FullCAM) to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Avondale Human Induced Regeneration Project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="903" width="1663" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155023/ERF165905_SeqCurve-1.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155023/ERF165905_SeqCurve-1.png 1663w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155023/ERF165905_SeqCurve-1-300x163.png 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155023/ERF165905_SeqCurve-1-1024x556.png 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155023/ERF165905_SeqCurve-1-768x417.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155023/ERF165905_SeqCurve-1-1536x834.png 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155023/ERF165905_SeqCurve-1-1320x717.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the landholder of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from landholder as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[6]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>A summary of regeneration checks required for the Avondale Human Induced Regeneration Project is set out below:</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[7]</a></sup></td>
<td width="359">01 January 2024</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[8]</a></sup></td>
<td width="359">01 January 2028</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[9]</a></sup></td>
<td width="359">01 January 2034</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Project Area Files</strong></h3>
<p>GIS shapefiles for the project can be downloaded <a href="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155031/ERF165905_ProjectFiles.zip">here</a>. These files detail the project stratification including the carbon estimation areas and exclusion areas.</p>
	</div>
</div>



<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a1641180c07b"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 4<br />
<sup>[3] </sup>Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c3 Section 28<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[7]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[8]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[9]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a1641180c265"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a1641180c30e"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/erf165905/">Avondale</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Berangabah Yallock</title>
		<link>https://greencollar.com.au/projects/erf101494/</link>
		
		<dc:creator><![CDATA[GreenCollar]]></dc:creator>
		<pubDate>Wed, 14 Jun 2023 04:19:44 +0000</pubDate>
				<guid isPermaLink="false">https://greencollar.com.au/?post_type=project&#038;p=8096</guid>

					<description><![CDATA[<p>The post <a href="https://greencollar.com.au/projects/erf101494/">Berangabah Yallock</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></description>
										<content:encoded><![CDATA[
		<div id="fws_6a1641180eb21"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet padding-20-percent_phone "  data-border-radius="15px" data-padding-pos="top-bottom" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This project is located North East of Ivanhoe in NSW in the Murray Darling Depression bioregion. The land consists of flat, undulating plains with some hilly areas. The dominant species observed on the property from field surveys include Dodonaea viscosa, Eremophila sturtii, Lycium austral, Senna artemisioides and Eucalptus sp.</p>
<p>The objective of this project is to regenerate natural woodlands and shrublands.  This is achieved by controlled grazing and feral animal management across the project area along with fencing upgrades. In addition to sequestering carbon, regeneration of native vegetation in the project area reverses land degradation caused by feral goats and livestock and stabilises soils reducing erosion.</p>
<p>The Project (ERF101494) was declared project under the ‘Human Induced Regeneration of a Permanent Even-Aged Forest 1.1’ methodology (2013 c1) (the Determination) and generates Australian Carbon Credit Units (ACCUs).  This is the third version of the Human Induced Regeneration methodology.</p>
<p>The project has issued both Kyoto ACCUs and non-Kyoto ACCUs in accordance with the date the carbon sequestration occurred. Kyoto ACCUs are issued for all carbon sequestration which has occurred after 14 May 2013 and non-Kyoto ACCUs are issued for carbon sequestration that occurred prior to this date.</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="100%">
<tbody>
<tr>
<td width="26%"><strong>Methodology Determination</strong></td>
<td width="73%">Human-Induced Regeneration of a Permanent Even-Aged Native Forest &#8211; 1.1 Methodology Determination 2013 c1</td>
</tr>
<tr>
<td width="26%"><strong>Project Declaration Date</strong> <a name="_ednref1"></a><a href="#footnotes"><sup>[1]</sup></a></td>
<td width="73%">10 July 2015</td>
</tr>
<tr>
<td width="26%"><strong>Permanence Period</strong></td>
<td width="73%">100 years</td>
</tr>
<tr>
<td width="26%"><strong>Baseline Period </strong><a name="_ednref2"></a><a href="#footnotes"><sup>[2]</sup></a></p>
<p>(10 year period before project commencement)</td>
<td width="73%">July 1997 – June 2007</td>
</tr>
<tr>
<td width="26%"><strong>Baseline management </strong></p>
<p>(Management during the Baseline Period)</td>
<td width="73%">Suppression of development of forest cover through uncontrolled livestock grazing, uncontrolled feral animal populations.</p>
<p>Confirmed by evidence.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Commencement Date </strong><a name="_ednref3"></a><a href="#footnotes"><sup>[3]</sup></a></p>
<p>(Date at which sufficient regeneration had started in the CEA)</td>
<td width="73%">01 July 2008</p>
<p>Note: the method requires there to be some vegetation present, at the modelling commencement in order to confirm that the area has the capacity to regenerate.</td>
</tr>
<tr>
<td width="26%"><strong>Modelling Tool </strong></td>
<td width="73%">Reforestation Modelling Tool</td>
</tr>
<tr>
<td width="26%"><strong>Audit</strong></td>
<td width="73%">There has been 1 audits undertaken by registered Greenhouse and Energy Auditors which have confirmed the project complies with the Methodology Determination and the requirements of the CFI Act in all material respects for the periods audited. The most recent audit report was issued on the 26 August 2016.</td>
</tr>
</tbody>
</table>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>HIR project Carbon Estimation Areas</strong></h3>
<p>&nbsp;</p>
<h6><em><strong>What are Carbon Estimation Areas?</strong></em></h6>
<p>A CEA is an area of land within a project area where the project activity or activities are being carried out to sequester carbon (for example, the cessation of mechanical or chemical clearing or management of timing and extent of grazing to enable regeneration of vegetation to forest) and for which ACCUs can be credited<sup><a href="#footnotes" name="_ednref4">[4]</a></sup>.</p>
<p>These are the areas where project activities occur and where carbon abatement will be modelled applying standardised estimation formulae approved by the Clean Energy Regulator.  There can be one or many CEAs on a Project Area.</p>
<p>Each CEA must contain areas of eligible land greater than 0.2ha in size in which the project activities are implemented and which have started to become native forest through regeneration.</p>
<ul>
<li><strong>Eligible Land </strong>is land that didn’t have forest cover during the baseline period (ie. the 10 years before project commencement) and which has been used or managed in a way that suppresses development of forest cover.</li>
<li>A particular area of land has <strong>Forest cover </strong>if the land has an area of at least 0.2 of a hectare and has trees that are 2 metres or more in height and provide crown cover of at least 20% of the land.</li>
</ul>
<p>&nbsp;</p>
<h6><em><strong>Stratification of Berangabah Yallock HIR Project Area into CEAs</strong></em></h6>
<p>Stratification is the process of “demarcating the boundaries of CEAs from ineligible and non-implementation areas within a project area”<sup><a href="#footnotes" name="_ednref5">[5]</a></sup>.</p>
<p>There are Guidelines setting out how Project Areas are stratified into CEAs.  These include rules about evidence, stratification and record keeping to support the requirements in the CFI Rule 2015 (2018 and 2019 Amendments) including key method eligibility requirements.</p>
<p>Stratification of the Berangabah Yallock HIR Project was carried out in accordance with the Determination and first reported to the Clean Energy Regulator for a reporting period ending 31 March 2016.<sup><a href="#footnotes" name="_ednref6">[6]</a></sup></p>
<p>A summary of the stratification of the Berangabah Yallock HIR Project is set out below:</p>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<table width="99%">
<tbody>
<tr>
<td width="49%"><strong>Project Area</strong></td>
<td width="49%">83,678 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Number of Carbon Estimation Areas (CEA) </strong><a name="_ednref7"></a><sup><a href="#footnotes" name="_ednref6">[7]</a></sup></td>
<td width="49%">2</td>
</tr>
<tr>
<td width="49%"><strong>Total Carbon Estimation Areas (CEA)Size </strong></td>
<td width="49%">14,339 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Total area excluded from CEA </strong></td>
<td width="49%">69,341 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA &#8211; </strong></p>
<p>Pre-existing forest cover (forest present at any time during the baseline period)</td>
<td width="49%">39,411 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>No forest potential (areas of land that do not meet the requirements of forest potential)</td>
<td width="49%">7,834 hectares</td>
</tr>
<tr>
<td width="49%"><strong>Excluded from CEA</strong></p>
<p>Non-project area (areas of land that are within the project area but excluded for other reason e.g. infrastructure or areas excluded for production purposes)</td>
<td width="49%">22,096 hectares</td>
</tr>
</tbody>
</table>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155045/ERF101494_ProjectStrata.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155045/ERF101494_ProjectStrata.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155045/ERF101494_ProjectStrata-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155045/ERF101494_ProjectStrata-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155045/ERF101494_ProjectStrata-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155045/ERF101494_ProjectStrata-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155045/ERF101494_ProjectStrata-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155045/ERF101494_ProjectStrata-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the project area boundary and the different elements of project design including the carbon estimation areas and exclusion areas.  This stratification may reflect both initial stratification and subsequent revisions.</p>
<p>In order to inform the initial stratification of the Berangabah Yallock HIR Project in accordance with the Determination, GreenCollar carried out field surveys and data collection.  This included collection of data on existing vegetation species, photos and a detailed site description.</p>
<p>Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas. The extent of exclusion areas (totalling 69,341 ha), comprised of pre-existing forest cover (39,411 ha) and areas which classified as having no forest potential (7,834 ha). Through this process a final eligible CEA area of 14,339 ha was confirmed.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155043/ERF101494_SatImage.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155043/ERF101494_SatImage.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155043/ERF101494_SatImage-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155043/ERF101494_SatImage-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155043/ERF101494_SatImage-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155043/ERF101494_SatImage-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155043/ERF101494_SatImage-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155043/ERF101494_SatImage-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This maps shows a current satellite image of the project area.  Satellite imagery and remote sensing datasets were used to identify eligible land and exclusion areas.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a1641180fa8f"  data-column-margin="40px" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  vc_row-o-equal-height vc_row-flex  vc_row-o-content-middle  leftcontent-rightimg-row orange-links reverse_columns_column_phone "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_CEA.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_CEA.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_CEA-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_CEA-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_CEA-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_CEA-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_CEA-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_CEA-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div><div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div><div class="img-with-aniamtion-wrap " data-max-width="100%" data-max-width-mobile="default" data-shadow="none" data-animation="fade-in" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="100" width="100" data-animation="fade-in" src="" alt=""  />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows a summary of all CEA and Exclusion Areas.</p>
<p>&nbsp;</p>
<h3><strong>Project Sequestration and Abatement<br />
</strong></h3>
<p>&nbsp;</p>
<p>This version of the HIR Methodology required using the Reforestation Modelling Tool to determine the sequestration of carbon stocks and emissions required to calculate the net abatement amount for each reporting period. The carbon dioxide equivalent net abatement amount in relation to a reporting period for the project is taken to be the change in carbon stock for the project area less the project emissions. Any carbon stock that accumulated by the crediting start date for the project is calculated as the initial carbon stock and is removed from the calculation of abatement as the proponent is not entitled to credits for it.</p>
<p>See below for the average per hectare sequestration for the Berangabah Yallock HIR project.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="898" width="1638" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_SeqCurve.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_SeqCurve.png 1638w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_SeqCurve-300x164.png 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_SeqCurve-1024x561.png 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_SeqCurve-768x421.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_SeqCurve-1536x842.png 1536w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155037/ERF101494_SeqCurve-1320x724.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Implementation &amp; Monitoring</strong></h3>
<p>&nbsp;</p>
<p>The activities for the project are:</p>
<ul>
<li>the management of the timing &amp; extent of grazing, and</li>
<li>the management, in a humane way, of feral animals</li>
</ul>
<p>Since project commencement these activities have been undertaken across the project area to assist the regeneration of native forest in attaining forest cover. Once the initial offsets report has been completed, GreenCollar works closely with the landholder of the project property to collect land management information every quarter. This is reviewed and reported on in each offsets report.</p>
<p>A summary of monitoring activities and evidence collection undertaken on this project is set out below:</p>
<ul>
<li>Evidence collection in relation to grazing and herd management</li>
<li>Evidence collection in relation to removal and reduction of feral animals</li>
<li>Evidence of fire management activities</li>
<li>Evidence collection from landholder as to other land management activities as relevant</li>
<li>Change detection assessments</li>
<li>Repeat biomass inventory surveys to track biomass change of regenerating vegetation</li>
<li>Daily fire hotspot monitoring and review of Seasonal Fire Risk</li>
<li>Review of SPEI drought index</li>
<li>Regeneration Gateway Checks</li>
</ul>
<p>These surveys are currently not required under the HIR method but are implemented by GreenCollar to provide additional assurance that biophysical threats to carbon stores such as grazing, drought and fire are not negatively impacting the regeneration and to track progress of regeneration of the native forest. In addition, the data collected is utilised for broader research purposes.</p>
	</div>
</div>



<div class="img-with-aniamtion-wrap " data-max-width="75%" data-max-width-mobile="default" data-shadow="none" data-animation="none" >
      <div class="inner">
        <div class="hover-wrap"> 
          <div class="hover-wrap-inner">
            <img loading="lazy" decoding="async" class="img-with-animation skip-lazy " data-delay="0" height="2953" width="2481" data-animation="none" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155039/ERF101494_BiomassWaypoints.png" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155039/ERF101494_BiomassWaypoints.png 2481w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155039/ERF101494_BiomassWaypoints-252x300.png 252w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155039/ERF101494_BiomassWaypoints-860x1024.png 860w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155039/ERF101494_BiomassWaypoints-768x914.png 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155039/ERF101494_BiomassWaypoints-1290x1536.png 1290w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155039/ERF101494_BiomassWaypoints-1721x2048.png 1721w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155039/ERF101494_BiomassWaypoints-1320x1571.png 1320w" sizes="auto, (min-width: 1450px) 75vw, (min-width: 1000px) 85vw, 100vw" />
          </div>
        </div>
      </div>
    </div>
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p>This map shows the points within the project area where vegetation biomass surveys were conducted as part of the monitoring process.</p>
<p>A <strong>Biomass Waypoint </strong>is a randomly allocated point within the project area where sampling data is collected.</p>
	</div>
</div>




	<div class="wpb_gallery wpb_content_element clearfix">
		<div class="wpb_wrapper"><div class="wpb_gallery_slidesflickity_static_height_style" data-onclick="link_no" data-interval="5"><div class="nectar-flickity not-initialized instace-6a1641181108d" data-drag-scale="" data-overflow="hidden" data-wrap="no-wrap" data-spacing="default" data-shadow="none" data-autoplay="" data-autoplay-dur="" data-free-scroll="" data-controls="none"><div class="flickity-viewport"> <div class="flickity-slider"><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155042/ERF101494_Biomass_Photo1-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155042/ERF101494_Biomass_Photo1-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155042/ERF101494_Biomass_Photo1-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155042/ERF101494_Biomass_Photo1-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155042/ERF101494_Biomass_Photo1.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div><div class="cell" data-lazy="false"><img loading="lazy" decoding="async" width="1024" height="768" src="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155041/ERF101494_Biomass_Photo2-1024x768.jpg" class="skip-lazy attachment-large" alt="" srcset="https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155041/ERF101494_Biomass_Photo2-1024x768.jpg 1024w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155041/ERF101494_Biomass_Photo2-300x225.jpg 300w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155041/ERF101494_Biomass_Photo2-768x576.jpg 768w, https://greencollar-website.s3.ap-southeast-2.amazonaws.com/wp-content/uploads/2023/05/04155041/ERF101494_Biomass_Photo2.jpg 1080w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></div></div></div></div></div>
		</div> 
	</div> 
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<h3><strong>Regeneration Checks</strong></h3>
<p>&nbsp;</p>
<p>The Guidelines require that Proponents must provide regeneration checks at least once every five years from the start of the project’s last or only crediting period until CEAs pass their forest cover assessment date<sup><a href="#footnotes" name="_ednref1">[8]</a></sup>, and upon request by the Clean Energy Regulator.</p>
<p>A summary of regeneration checks required for the Berangabah Yallock HIR Project is set out below:</p>
<table width="614">
<tbody>
<tr>
<td width="255"><strong>Regeneration Check: Year 6</strong></p>
<p><strong>7.5% canopy cover at 100ha scale</strong><sup><a href="#footnotes" name="_ednref2">[9]</a></sup></td>
<td width="359">10 July 2020 – Completed</td>
</tr>
<tr>
<td width="255"><strong>Regeneration Check: Year 10</strong></p>
<p><strong>10% canopy cover at 10ha scale</strong><sup><a href="#footnotes" name="_ednref3">[10]</a></sup></td>
<td width="359">10 July 2024</td>
</tr>
<tr>
<td width="255"><strong>Forest Cover Assessment Date </strong><sup><a href="#footnotes" name="_ednref4">[11]</a></sup></td>
<td width="359">10 July 2030</td>
</tr>
</tbody>
</table>
<p>The process and methodology includes one or more of the three evidence requirements and reporting:</p>
<ul>
<li>Evidence level 1: Change detection analysis, or</li>
<li>Evidence level 2: Remote sensing analysis and/or</li>
<li>Evidence level 3: Field data; and</li>
<li>Reporting</li>
</ul>
	</div>
</div>



<div class="divider-wrap" data-alignment="default"><div style="height: 25px;" class="divider"></div></div>
			</div> 
		</div>
	</div> 
</div></div>
		<div id="fws_6a164118123e1"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div  class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><a id="footnotes"></a></p>
<h5>Footnotes</h5>
	</div>
</div>




<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><sup>[1]</sup> Carbon Credits (Carbon Farming Initiative) Act 2011 Section 27<br />
<sup>[2]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 1.3<br />
<sup>[3]</sup> Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest—1.1) Methodology Determination 2013  c1 Section 4.5<br />
<sup>[4]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[5]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[6]</sup> The initial stratification was reported on prior to the public release of the Guidelines on stratification, evidence and records in May 2019. These guidelines also set out administrative arrangements for projects that have previously reported, including a pragmatic approach that will be taken in situations where additional evidence is required to meet these guidelines. Additionally, the project is defined as an existing project in accordance with Section 9AA of the CFI Rule 2015.<br />
<sup>[7]</sup> Supplementary Guidance from the Clean Energy Regulator on 19 November 2014 allows participants to choose to combine several CEAs into one CEA. For example, where small CEAs are located next to each other and share common features.<br />
<sup>[8]</sup> Forest cover assessment date has the same meaning as that given by section 9AA(6) of the CFI Rule.<br />
<sup>[9]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[10]</sup> Guidelines on evidence, stratification and records 8 May 2019<br />
<sup>[11]</sup> Carbon Credits (Carbon Farming Initiative) Rule 2015 Section 9AA(6)</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>

		<div id="fws_6a16411812598"  data-column-margin="default" data-midnight="dark"  class="wpb_row vc_row-fluid vc_row  "  style="padding-top: 0px; padding-bottom: 0px; "><div class="row-bg-wrap" data-bg-animation="none" data-bg-overlay="false"><div class="inner-wrap"><div class="row-bg"  style=""></div></div></div><div class="row_col_wrap_12 col span_12 dark left">
	<div style="margin-top: 20px; " class="vc_col-sm-12 wpb_column column_container vc_column_container col no-extra-padding inherit_tablet inherit_phone "  data-padding-pos="all" data-has-bg-color="false" data-bg-color="" data-bg-opacity="1" data-animation="" data-delay="0" >
		<div class="vc_column-inner" >
			<div class="wpb_wrapper">
				
<div class="wpb_text_column wpb_content_element " >
	<div class="wpb_wrapper">
		<p><i>The information on this page was last updated July 2023.  The content provided is current as of that date and may be subject to change. Any updates or changes made after this date may not be reflected on this page. Please verify the current status of any information before relying on it</i>.</p>
	</div>
</div>




			</div> 
		</div>
	</div> 
</div></div>
<p>The post <a href="https://greencollar.com.au/projects/erf101494/">Berangabah Yallock</a> appeared first on <a href="https://greencollar.com.au">GreenCollar</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
